My proposed plan for renewal of the river is to create a core of clean water that allows interaction at specific points along the river. Filtration of water begins at a specific site above the temple using water purification plants and sand filtration. The total filtration system involves 4 interaction sites: 

A) Filtration,

B) Cleansing, 

C) Temple Extension Program, 

D) Pashupatinath Temple

 

 
Full final model of a filtration system that cleans dirty water and reduces health risks.

Full final model of a filtration system that cleans dirty water and reduces health risks.

 
A) Filtration leading into B) Cleansing and bathing zones. 

A) Filtration leading into B) Cleansing and bathing zones. 

Sand filters leading into C) Temple Extension Site. 

Sand filters leading into C) Temple Extension Site. 


 
C) Temple Extension site leading into sand filtration tanks.  

C) Temple Extension site leading into sand filtration tanks.  

Sand filters leading clean water into D) Pashupatinath Temple.    

Sand filters leading clean water into D) Pashupatinath Temple.  

 

 

< Drawings                                                                                 Appendix >